Das Bike Projekt: Motor Assembly oh so close….

Carbs and tank are on

Left to do:

Clean up tools

Put on Exhaust

check valve lash

put on valve covers

change jets

check for spark

add 1 gallon of gas

check oil

MY idol, Professor FATE!

push the button MAX!

Up Next https://kirkusblog.com/2012/06/25/das-bike-projekt-put-the-spurs-to-er/

Das Bike Projekt: Motor Assembly Cont.

99 degrees in the garage, but i did last 2 1/2 hours and got a little done! Up Next https://kirkusblog.com/2012/06/22/das-bike-projekt-motor-assembly-oh-so-close/

Das Bike Projekt: Engine Rebuild

82mm = 746cc… 87mm = 839cc… 97mm = 1044cc

Up Next https://kirkusblog.com/2012/06/20/grattan-raceway/

Das Bike Projekt: Back on Track

I started pulling the bike back down, I Tightened the loose timing chest. If I  forgot to torque it, or the gasket compressed over time, I do not know. Next step is do the compression test, check timing and valves, and have a go at the carbs.

Up Next https://kirkusblog.com/2012/06/12/das-bike-projekt-tear-it-down/

Das Bike: Current State of Things…

Waiting for a warm day…….

Up Next https://kirkusblog.com/2012/04/02/das-bike-projekt-on-hold-for-avion-repairs-3/

Old MotoPhotos!

Too cold, and my back is too twisted to work in the garage this week, so enjoy some old MotoPhotos!

Das Bike: Long Overdue Update!

ImageWell the bike has about 150 miles on it now, but as the summer wore on it got a little cranky, not wanting to rev over 4K. I have put a Uli Electronic ignition in it, but its still rubbish as far as running strong. More tinkering with the Dellortos in my future i suspect!

Up Next https://kirkusblog.com/2012/02/29/das-bike-current-state-of-things/

mDas Bike Projekt: Final Fettling

Things are good with the bike. Timing it with the light seems to be impossible so i did it “by ear” a couple if times, first setting was too retarded (as in the opposite of advanced), second setting works awesome when the bike is hot, but is too much advance for an easy cold start. So a setting in the middle should make it happy, hopefully get to that this week. ALso I think the idle jet may be too rich, because now when i use the enriching lever it just floods the bike out. So, minor adjustments, but it runs and stops, and steers, kinda. The friction disk for the steering damper has shattered so there’s no damping at present, i will have to order another set of disks and rivets, might as well do the headstock bearings while im in there, but that means taking the front all apart again, so i may wait for the first snow to fly before i do that. No new pictures, so why don’t we all admire Anke-Eve Goldman, instead?

Up Next https://kirkusblog.com/2012/01/19/das-bike-long-overdue-update/

Anke-Eve Goldman, packing for some fall Touring

Das Bike Projekt: Mark II (I hope you like our new direction)

Well the new Omega alternator is in place, as is the /6 front cover (for better cooling) An all new engine harness, and a steel gas tank. I decided to leave the seat spaced back, I like the riding position better…

Up Next https://kirkusblog.com/2011/10/05/das-bike-projekt-final-fettling/